Merge pull request #575 from mattermost/jasonblais-patch-1
Update dot release checklist
This commit is contained in:
commit
110df175bf
|
@ -105,17 +105,27 @@ The final release is cut. If an urgent and important issue needs to be addressed
|
|||
5. Marketing:
|
||||
- Schedule Twitter announcement for 08:00 PST on the date of marketing announcement
|
||||
|
||||
If a bug fix release is required, run through the following steps again:
|
||||
If a bug fix release is required, run through the following steps:
|
||||
|
||||
1. Build:
|
||||
- Tag a new release (e.g. 1.1.1) and run an official build
|
||||
1. Dev:
|
||||
- Submit, review and merge patches for the release branch
|
||||
- Cut an RC containing all bug fixes
|
||||
2. PM:
|
||||
- Verify each of the issues in the RC are fixed
|
||||
3. Dev:
|
||||
- Tag a new release (e.g. 1.1.1) and run an official build including code-signing
|
||||
- Publish the patch release in [GitHub repository](https://github.com/mattermost/desktop/releases) with SHA-256 checksums
|
||||
- Delete RCs after final version is shipped
|
||||
- Merge changes made to release branch into master
|
||||
4. PM:
|
||||
- Update [Mattermost download page](https://mattermost.org/download)
|
||||
- Update the download links in [installation guides](https://docs.mattermost.com/install/desktop.html)
|
||||
- Update the changelog with notes on patch releases (see [example entry](https://docs.mattermost.com/help/apps/desktop-changelog.html#release-v3-4-1))
|
||||
- Verify each of the issues in the patch release are fixed
|
||||
3. Dev:
|
||||
- Publish the patch release in [GitHub repository](https://github.com/mattermost/desktop/releases)
|
||||
- Draft [Mattermost Security Updates](http://about.mattermost.com/security-updates/) if applicable, but do not post until seven days after official release
|
||||
- Check Security Issues spreadsheet and confirm disclosure text
|
||||
- Contact owners of [community installers](http://www.mattermost.org/installation/) to update install version number
|
||||
5. Marketing:
|
||||
- Schedule Twitter announcement for 08:00 PST on the date of marketing announcement
|
||||
|
||||
### G. (T-minus 0 working days) Release Day
|
||||
|
||||
|
|
Loading…
Reference in a new issue